Most candidates were able to
- position the doors and windows correctly;
- adhere strictly to the specifications by showing the appropriate doors, windows and roof type;
- distinguish between the floor level and ground level.
However, the following shortcomings were observed:
- inability to indicate the location of the threshold steps correctly;
- inability to construct the semi-circular arches;
- failure to provide balustrade for the verandah;
- failure to show the recessed portion of the right side of the building at the roof level.
The respective front and right side elevations of the building are as shown on the next page.