Candidates were required to make two  stopped housing joint.  Most candidates  were able to make the joint.  However, a few  candidates could not make the joint.   Each candidate’s final work piece was to have: trench (4 sides, 2  bottoms and 2 ends), tongue (2 shoulders, 2 faces) and fitness of two joints.