waecE-LEARNING
Building Construction Paper 1,Nov/Dec. 2012  
Questions:   1 2 3 4   Main
General Comments
Weakness/Remedies
Strength
Specifications

Candidates' Specification

FOUNDATION:        675 x 225 concrete strip laid at a depth of 900 below ground    level.

FLOORS:                               Earth filling;
                                          Hardcore – 300; 
                                           Concrete slab – 150;
                                           Mortar screed – 25.

WALLS:      All walls are 225 sandcrete hollow blocks with 12 mortar rendering on both sides.
           
DOORS:             D1 – 1200 x 2100 glazed metal door;
                       D2 - 900 x 2100 panel wooden door with 100 x 75 hardwood timber frame.

WINDOWS:                       All windows are glazed aluminium sliding type:
                                       W1 – 1800 x 1200;
                                      W2 – 1200 x 1200;
                                       W3 – 600 x 600.

BEAMS/LINTELS
AND COLUMNS:                225 x 225 reinforced concrete.

WARDROBES:               Partitioned into cloth and box compartments.

THRESHOLD STEPS:          Width – 1200;
                                     Tread  –  300;
                                    Rise    –   150.
           
VERANDAH:    Metal balustrade (MB)900 high measured from floor level.

ROOF:    Double pitched timber roof with corrugated galvanized iron roofing sheets;.
              Eaves projection – 750;
              Pitch – 150;
               Height from floor to ceiling – 3000


_____________________________________________________________________________________________________
Powered by Sidmach Technologies(Nigeria) Limited .
Copyright © 2015 The West African Examinations Council. All rights reserved.