Building construction Paper 3 WASSCE (SC), 2016

General Comments

The standard of the paper compared favourably with those of previous years.
Also, candidates’ performance was better than the previous years.  Many of the candidates succeeded in producing the three drawings required within the time allotted for the paper and a good number of those who attempted question 4 prepared the door and window schedules in accordance with the conventional format.